CoLaboratory

CoLab Interior Rendering

CoLaboratory Building (CoLab)

Location: 

Behind Hayden Hall, taking the place of the current dilapidated Facilities Operations garages.

Program: 

Working Lab, a Clean Lab, and a Building Information Modeling (BIM) Lab for students to build and construct, both digitally and physically.

Storage space for Facilities Operations and Artillery and an updated carpenters shop.

Building Sequence:

The building has two phases. Initially, it will serve as temporary classroom and office spaces for faculty and students during the larger Webb, Dewey, Ainsworth, and Mack construction project. During phase 2, the building will be fitted for its permanent use as a shared space between educational facilities and the needs of Facilities Operations.

Construction time frame: August 2016 – January 2017

 

Save

Save

Save

Save

Photo of cadet climbing over the footer

Connect with us

Norwich University
158 Harmon Drive
Northfield, VT 05663 USA
802.485.2000 | 1.800.468.6679
Copyright © 2017 Norwich University - all rights reserved